{"id":360611,"date":"2024-06-27T10:00:00","date_gmt":"2024-06-27T08:00:00","guid":{"rendered":""},"modified":"2025-04-04T13:36:12","modified_gmt":"2025-04-04T11:36:12","slug":"uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks","status":"publish","type":"post","link":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/","title":{"rendered":"Uus Moves III plaani laiendus 2024. aastal: N\u00f5uded ja sammud taotlemiseks"},"content":{"rendered":"<blockquote>\n<p><strong>Uuendatud 1. aprillil 2025:<\/strong> Moves III plaani kehtivust pikendatakse tagasiulatuvalt kuni 31. detsembrini 2025. Kehtib alates 1. jaanuarist 2025 tehtud ostudele.<\/p>\n<\/blockquote>\n<p>25. juunil 2024 <strong>on Hispaania valitsus pikendanud Moves III plaani 2024. aastal kuni 31. detsembrini<\/strong>. Suurep\u00e4rane uudis elektrilise liikuvuse armastajatele ja j\u00e4tkuvaks abiks \u00fcleminekuks keskkonnas\u00f5bralikumale liikuvusele. Moves III plaani pikendamine pakub uusi v\u00f5imalusi neile, kes soovivad kasu saada elektris\u00f5idukite ostmiseks ja laadimispunktide paigaldamiseks saadaval olevatest toetustest. R\u00e4\u00e4gime teile k\u00f5igest, mida me teame Moves III plaanist ja elektrilise liikuvuse tulevikust Hispaanias.<\/p>\n<h2>Moves III plaani pikendamine 2024. aastal<\/h2>\n<p>\u00dcle <strong>200 miljoni euro<\/strong> elektriautode ostmiseks ja <strong>50 miljoni euro<\/strong> rasketehnika uuendamiseks, uus Moves III plaan <strong>pikendatakse 2024. aasta l\u00f5puni<\/strong>. Uusi toetusi elektriautode ja laadimispunktide ostmiseks saab juba taotleda erinevates autonoomsetes piirkondades. P\u00e4rast kuude kaupa 100% eelarve kasutamist on tuhanded kasutajad juba neid uusi toetusi taotlenud. Seet\u00f5ttu on h\u00e4davajalik, et <strong>taotled oma toetust v\u00f5imalikult kiiresti<\/strong>, kuna kuigi t\u00e4htaeg on avatud kuni 31. detsembrini, <strong>v\u00f5ib eelarve l\u00f5ppeda palju varem<\/strong>.<\/p>\n<h3>Moves III plaan pikendatakse 31. detsembrini 2024, kokku \u00fcle 1.500 miljoni euro eelarvega<\/h3>\n<p>Hispaania valitsus on teinud otsustava sammu j\u00e4tkusuutliku liikuvuse kindlustamiseks, kuulutades v\u00e4lja Moves III plaani pikendamise kuni <strong>31. detsembrini 2024<\/strong>. See pikendamine mitte ainult ei pikenda programmi kehtivust, vaid suurendab ka selle eelarvet, ulatudes <strong>\u00fcle 1.500 miljoni euro<\/strong>. See meede tugevdab eesm\u00e4rki edendada elektris\u00f5idukite kasutuselev\u00f5ttu ja parandada laadimisinfra struktuuri kogu Hispaanias. Kui oled elektrilise liikuvuse armastaja, avasta <b data-stringify-type=\"bold\"><a class=\"c-link\" href=\"https:\/\/v2charge.com\/et\/mg7-precio-espana-fecha-lanzamiento\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-stringify-link=\"https:\/\/v2charge.com\/et\/mg7-precio-espana-fecha-lanzamiento\/\" data-sk=\"tooltip_parent\">MG7<\/a><\/b>, \u00fcks k\u00f5ige oodatumaid elektriautosid.<\/p>\n<h2>Moves III plaani toetuste taotlemise n\u00f5uded 2024. aastal<\/h2>\n<p>Et kasutada Moves III plaani toetusi 2024. aastal, on oluline teada n\u00f5udeid ja taotlemisprotsessi. T\u00e4nu Moves III plaani pikendamisele saavad tarbijad j\u00e4tkuvalt kasu toetustest, mis v\u00f5ivad ulatuda kuni <strong>7.000 eurot elektriautode ostmiseks<\/strong> ja kuni <strong>9.000 eurot laadimispunktide paigaldamiseks<\/strong>. Need toetused esindavad olulist v\u00f5imalust v\u00e4hendada elektriautode algkulusid ja h\u00f5lbustada \u00fcleminekut j\u00e4tkusuutlikumale liikuvusele.<\/p>\n<p>Allpool toome v\u00e4lja peamised n\u00f5uded, mida Moves III taotlejad peavad t\u00e4itma:<\/p>\n<ol>\n<li><strong>Toetuste taotlemise n\u00f5uded elektriautode ostmiseks<\/strong>:\n<ul>\n<li>Autod peavad olema uued ja elektrilised, sealhulgas pistikh\u00fcbriidid.<\/li>\n<li>Auto hind ei tohi \u00fcletada 45.000 eurot enne makse.<\/li>\n<li>Toetust v\u00f5ib saada kuni 7.000 eurot auto kohta.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Laadimispunktide paigaldamise n\u00f5uded<\/strong>:\n<ul>\n<li>Toetatakse kuni 70% paigaldamise kogumaksumusest eraisikutele ja korteri\u00fchistutele ning kuni 35% ettev\u00f5tetele.<\/li>\n<li>Toetused katavad ka kiire ja \u00fclikiire laadimisinfra paigaldamise avalikes kohtades.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Ettev\u00f5tete toetuste taotlemise n\u00f5uded<\/strong>:\n<ul>\n<li>Ettev\u00f5tted saavad taotleda toetusi laadimispunktide paigaldamiseks oma ruumides, maksimaalse toetusega 35%, kui infrastruktuur on privaatne, ja kuni 30%, kui see on avalik juurdep\u00e4\u00e4suga, mille v\u00f5imsus on alla 50 kW.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-155304\" src=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/05\/section-cable-charger.jpg\" alt=\"section cable charger\" width=\"960\" height=\"560\" srcset=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/05\/section-cable-charger.jpg 960w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/05\/section-cable-charger-300x175.jpg 300w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/05\/section-cable-charger-768x448.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/p>\n<h2>Steps to apply for the Moves III plan in 2024<\/h2>\n<p>Moves III plaani taotlemiseks 2024. aastal pead j\u00e4rgima j\u00e4rgmisi olulisi samme. Alates algsest dokumentide \u00fclevaatusest kuni taotluse esitamise ja toetuse t\u00f5endamiseni, <strong>iga etapp on loodud tagama, et taotlejad saaksid programmi eeliseid t\u00f5husalt ja probleemideta kasutada<\/strong>.<\/p>\n<p>Allpool selgitame iga\u00fcht neist sammudest, et saaksid Moves III plaani taotlemise protsessi kindlalt l\u00e4bi viia ja veenduda, et sul on vajalik rahastus oma projekti jaoks.<\/p>\n<ol>\n<li><strong>Tehniliste dokumentide \u00fclevaatus<\/strong>:\n<ul>\n<li>Veendu, et sul on k\u00f5ik vajalikud dokumendid, nagu auto v\u00f5i laadimisinfra paigaldamise arve.<\/li>\n<li>On oluline \u00fcle vaadata iga autonoomse piirkonna spetsiifilised tingimused, kuna toetuste haldamine on piirkondlik.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Moves III taotluse esitamine oma autonoomses piirkonnas<\/strong>:\n<ul>\n<li>Taotlus tuleb esitada vastava autonoomse piirkonna m\u00e4\u00e4ratud asutuse veebilehe kaudu.<\/li>\n<li>Peab t\u00e4itma taotlusvormi ja lisama n\u00f5utavad dokumendid.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Oota oma toetuse taotluse heakskiitu<\/strong>:\n<ul>\n<li>Autonoomne piirkond vaatab taotluse l\u00e4bi ja kui see heaks kiidetakse, teavitatakse taotlejat protsessi j\u00e4tkamiseks.<\/li>\n<li>Ooteaeg heakskiidu saamiseks v\u00f5ib varieeruda, seega on soovitatav taotlus esitada v\u00f5imalikult kiiresti.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Toetuse saamiseks vajalike dokumentide esitamine<\/strong>:\n<ul>\n<li><span style=\"color: var(--contrast);\">Toetuse t\u00f5endamiseks tuleb esitada l\u00f5pparve ja muud t\u00f5endavad dokumendid, nagu paigaldustunnistused.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p>Igas autonoomses piirkonnas v\u00f5ivad protsessid veidi erineda, seet\u00f5ttu soovitame otsida Moves plaaniga liitunud ettev\u00f5tteid, mis aitavad sul osta elektriautot v\u00f5i paigaldada laadimispunkti. Kui soovid rohkem teada, saad lugeda meie artiklit <strong><a href=\"https:\/\/v2charge.com\/et\/plan-moves-ayudas\/\">Moves III plaani toetuste<\/a>.<\/strong><\/p>\n<p><a href=\"https:\/\/v2charge.com\/et\/encuentra-tu-instalador\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-162289\" src=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche.jpg\" alt=\"Encuentra instalador cargador Plan Moves III\" width=\"818\" height=\"818\" srcset=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche.jpg 818w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche-300x300.jpg 300w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche-150x150.jpg 150w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche-768x768.jpg 768w\" sizes=\"auto, (max-width: 818px) 100vw, 818px\" \/><\/a><\/p>\n<h2><span id=\"Hasta_el_70_de_descuento_en_la_instalacion_de_puntos_de_recarga_en_Cataluna_para_particulares\">Kuni 70% allahindlust laadimispunktide paigaldamisel eraisikutele ja 40% allahindlust ettev\u00f5tetele<\/span><\/h2>\n<p>Valitsus pakub toetusi kuni <strong>70% allahindlust<\/strong>, sealhulgas k\u00e4ibemaks, <strong>laadimispunktide paigaldamiseks eraisikutele<\/strong>. \u00dcldiselt saavad eraisikud maksimaalselt 10.000 eurot toetusi, nii laadimispunktide paigaldamiseks kui ka elektriautode soetamiseks. Soovitame lugeda meie juhendit <b data-stringify-type=\"bold\"><a class=\"c-link\" href=\"https:\/\/v2charge.com\/et\/coches-electricos-pequenos-2024-mejor-precio\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-stringify-link=\"https:\/\/v2charge.com\/et\/coches-electricos-pequenos-2024-mejor-precio\/\" data-sk=\"tooltip_parent\">v\u00e4ikeste ja odavate elektriautode<\/a><\/b> kohta 2024. aastal, kuna need autod on linnas ja piiratud eelarvega kasutajatele k\u00f5ige huvitavamad.<\/p>\n<div class=\"flex flex-grow flex-col max-w-full\">\n<div class=\"min-h-[20px] text-message flex flex-col items-start whitespace-pre-wrap break-words [.text-message+&amp;]:mt-5 juice:w-full juice:items-end overflow-x-auto gap-2\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"2afdcee8-4ce5-49b1-9550-ad4010baee64\">\n<div class=\"flex w-full flex-col gap-1 juice:empty:hidden juice:first:pt-[3px]\">\n<div class=\"markdown prose w-full break-words dark:prose-invert dark\">\n<p>Ettev\u00f5tted saavad kasu toetustest, mis katavad kuni <strong>30% allahindlust<\/strong> laadimispunktide paigaldamise kuludest, v\u00e4lja arvatud k\u00e4ibemaks. Alla <strong>5.000 elanikuga<\/strong> omavalitsustes v\u00f5ib see allahindlus ulatuda <strong>kuni 40%<\/strong>. \u00dcldiselt saavad nii suured ettev\u00f5tted kui ka v\u00e4ikeettev\u00f5tted taotleda Moves III plaani.<\/p>\n<p>Lisaks, kui sul on elektriauto ja plaanid reisida Hispaanias, soovitame lugeda meie juhendit <strong><a href=\"https:\/\/v2charge.com\/et\/cuanto-cuesta-cargar-coche-electrico-gasolinera\/\">kui palju maksab elektriauto laadimine bensiinijaamas<\/a><\/strong>.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"flex flex-grow flex-col max-w-full\">\n<div class=\"min-h-[20px] text-message flex flex-col items-start whitespace-pre-wrap break-words [.text-message+&amp;]:mt-5 juice:w-full juice:items-end overflow-x-auto gap-2\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"2afdcee8-4ce5-49b1-9550-ad4010baee64\">\n<div class=\"flex w-full flex-col gap-1 juice:empty:hidden juice:first:pt-[3px]\">\n<div class=\"markdown prose w-full break-words dark:prose-invert dark\">\n<h3>Kuidas taotleda allahindlusi Moves III plaani kaudu laadimispunkti jaoks?<\/h3>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>Kui k\u00fcsid endalt <strong>kuidas taotleda allahindlusi <a href=\"https:\/\/v2charge.com\/et\/\">elektriauto laadijate<\/a><\/strong> ostmiseks, r\u00e4\u00e4gime, kuidas saad neist toetustest kasu ja milliseid samme j\u00e4rgida t\u00f5husaks paigaldamiseks. Oluline on meeles pidada, et ettev\u00f5tete puhul on <strong>h\u00e4davajalik esitada k\u00f5igepealt Moves III plaani taotlus<\/strong> enne laadimispunktide ostmise v\u00f5i paigaldamise alustamist.<\/p>\n<ol>\n<li><strong>K\u00fcsi laadimispunkti paigaldamise ja ostmise eelarvet<\/strong>: <span style=\"color: var(--contrast);\">Esmalt pead k\u00fcsima eelarvet oma elektriauto laadija paigaldamiseks. Veendu, et eelarve sisaldab k\u00f5iki vajalikke komponente: laadimispunkt, paigaldamine ja vajadusel ehituslikud t\u00f6\u00f6d.<\/span><\/li>\n<li><strong>Moves III toetuse taotlemine oma autonoomses piirkonnas<\/strong>: <span style=\"color: var(--contrast);\">Veendu, et sinu paigaldusettev\u00f5te saaks sinu eest Moves III toetust taotleda, sealhulgas dokumentide esitamine ja koordineerimine vastavate ametiasutustega. M\u00f5nedes piirkondades saab taotluse esitada ainult kasutaja, kuid sinu paigaldusettev\u00f5te aitab sind kogu dokumentide ettevalmistamise protsessi jooksul.<\/span><\/li>\n<li><b style=\"font-size: inherit; color: var(--contrast);\">Dokumentide esitamine taotluse erinevates etappides:<\/b><span style=\"font-size: inherit; color: var(--contrast);\"> Paljudes autonoomsetes piirkondades jaguneb Moves III plaan erinevateks etappideks, seega pead esitama n\u00f5utavad dokumendid igas etapis kuni l\u00f5pliku heakskiiduni. Soovitame lugeda meie artiklit <strong><a href=\"https:\/\/v2charge.com\/et\/cuanto-tardan-pagar-plan-moves-iii\/\">kui kaua kulub Moves 3 toetuse maksmiseks<\/a><\/strong>.<\/span><\/li>\n<\/ol>\n<p>\u00dcldiselt on taotlemise ja heakskiidu protsess tavaliselt pikk, kuid koos kogenud paigaldusettev\u00f5ttega, kes aitab toetuse taotlemisel, on see palju lihtsam. Soovitame sul leida oma l\u00e4him paigaldaja meie <strong><a href=\"https:\/\/v2charge.com\/et\/encuentra-tu-instalador\/\">laadimispunktide paigaldajate<\/a><\/strong> v\u00f5rgustikust.<\/p>\n<h2>Moves III plaani pikendamine, oluline toetus autot\u00f6\u00f6stusele ja t\u00f6\u00f6kohtadele<\/h2>\n<p>Moves III plaani pikendamine omab ka positiivset m\u00f5ju Hispaania autot\u00f6\u00f6stusele, mis on investeerinud m\u00e4rkimisv\u00e4\u00e4rselt elektriautode tootmisse. Volkswageni grupp on suunanud <strong>10.000 miljonit eurot oma tehastesse Landabenis ja Martorellis<\/strong> ning uude akutehasesse Saguntos. Lisaks on oodata <strong>\u00fcle 4.000 miljoni euro investeeringut Vigo ja Zaragoza tehastesse<\/strong>. Need investeeringud on olulised t\u00f6\u00f6kohtade loomise ja majandusarengu jaoks ning s\u00f5ltuvad suuresti valitsuse toetusest ja kasvavast turust elektriautodele. Kui otsid elektriautot, soovitame sul tutvuda meie juhendiga <strong><a href=\"https:\/\/v2charge.com\/et\/coches-electricos-mas-baratos-2024\/\">odavaimate elektriautode<\/a> kohta 2024. aastal.<\/strong><\/p>\n<h3>Elektriautode toetuste ja toetuste tulevik Hispaanias<\/h3>\n<p>Vaatamata praeguste toetuste ja toetuste edusammudele, <strong>on b\u00fcrokraatia ja viivitused haldamises t\u00f6\u00f6stusele probleemiks<\/strong>. Praegu haldavad Moves III toetusi autonoomsed piirkonnad ja nende kehtivaks saamine v\u00f5ib v\u00f5tta kuni kaks aastat. J\u00e4rgmiste kuude jooksul on valitsuse eesm\u00e4rk aidata \u00fcletada neid takistusi ja seel\u00e4bi h\u00f5lbustada sujuvamat \u00fcleminekut elektrilisele liikuvusele Hispaanias. Seet\u00f5ttu <strong>ootame endiselt uudiseid uute Moves IV plaani toetuste kohta j\u00e4rgmiseks aastaks<\/strong>.<\/p>\n<p>Kui otsid v\u00e4ikest, kuid sportlikumat autot, soovitame sul vaadata uut pistikh\u00fcbriidi <strong><a href=\"https:\/\/v2charge.com\/et\/nuevo-byd-song-l-dm-hibrido-enchufable\/\">BYD Song L<\/a><\/strong> v\u00f5i uut elektriautot <strong><a href=\"https:\/\/v2charge.com\/et\/byd-dolphin-precio-espana\/\">BYD Dolphin<\/a><\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-149094\" src=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/04\/plan-moves-ayudas-coche-electrico.jpg\" alt=\"\" width=\"1200\" height=\"700\" srcset=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/04\/plan-moves-ayudas-coche-electrico.jpg 1200w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/04\/plan-moves-ayudas-coche-electrico-300x175.jpg 300w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/04\/plan-moves-ayudas-coche-electrico-1024x597.jpg 1024w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/04\/plan-moves-ayudas-coche-electrico-768x448.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<h2><span id=\"Cuanto_tendremos_que_esperar_para_el_nuevo_Plan_Moves_en_2024\">Kui kaua peame ootama uut Moves IV plaani?<\/span><\/h2>\n<p>Seoses Moves III plaani hiljutise pikendamisega 2024. aastal kuni 31. detsembrini on ootused uue Moves IV plaani k\u00e4ivitamise osas k\u00f5rged. See programm on oluline \u00fcleminekuks j\u00e4tkusuutlikule liikuvusele Hispaanias ning nii tarbijad kui ka autot\u00f6\u00f6stus on <strong>t\u00e4helepanelikud k\u00f5ikidele uudistele, mis v\u00f5ivad seonduda selle rakendamisega<\/strong>. Kuid kui kaua peame ootama Moves IV plaani saabumist?<\/p>\n<p>Moves IV plaan on kavandatud Hispaania valitsuse j\u00f5upingutuste t\u00e4iustamiseks elektriautode ostmise ja laadimisinfra paigaldamise edendamiseks. Siiski ei ole selle k\u00e4ivitamise t\u00e4pset kuup\u00e4eva veel ametlikult kinnitatud. Oodatakse, et p\u00e4rast praeguse Moves III plaani l\u00f5ppemist, mis kestab kuni 2024. aasta l\u00f5puni, j\u00f5ustub uus Moves IV plaan <strong>2025. aasta alguses<\/strong>.<\/p>\n<h3>Toetuste lihtsustamine ja kiirendamine Moves IV plaanis<\/h3>\n<blockquote>\n<p>Vastavalt t\u00f6\u00f6stus-, kaubandus- ja turismiminister H\u00e9ctor G\u00f3mez&#8217;i s\u00f5nadele <strong><em>&#8220;oodatakse, et uus Moves IV plaan toob sisse ajutise paindlikkuse toetuste v\u00e4ljamaksmise protsessis, v\u00f5imaldades nende kohaldamist otse s\u00f5iduki ostmise hetkel&#8221;<\/em><\/strong>.<\/p>\n<\/blockquote>\n<p>See muudatus on oluline <strong>ootamisaegade v\u00e4hendamiseks<\/strong> ja <strong>efektiivsema stiimuli pakkumiseks<\/strong> elektriautode ostjatele. See p\u00fchendumine viitab selgele suunale <strong>protsessi lihtsustamise ja kiirendamise<\/strong> suunas, mis v\u00f5iks muuta Moves IV plaani tarbijatele kergemini ligip\u00e4\u00e4setavaks ja kasulikuks. Kuigi veel ei ole esitatud konkreetseid \u00fcksikasju teiste v\u00f5imalike muudatuste kohta, on ootused k\u00f5rged, et need parandused h\u00f5lbustavad puhtamate ja j\u00e4tkusuutlikumate tehnoloogiate kasutuselev\u00f5ttu. Kui otsid elektriautot, mille laadimine on kiirem, ohverdades veidi autonoomiat, soovitame sul tutvuda 2024. aasta <strong><a href=\"https:\/\/v2charge.com\/et\/mejores-motos-electricas-comprar\/\">parimate elektrimootorrataste<\/a><\/strong> valikuga.<\/p>\n<h3>V\u00f5imalikud muudatused Moves IV plaani toetuste maksustamises<\/h3>\n<p>Teine aspekt, mille osas oodatakse paranemist Moves IV plaanis, on toetuste maksustamine. Praegu tuleb Moves III plaani toetused deklareerida kui <strong>kapitalitulu<\/strong>, mis lisab saajatele halduskoormust. Oodatakse, et uus Moves IV plaan vaatab selle protsessi \u00fcle, <strong>kaotades vajaduse nende toetuste deklareerimise j\u00e4rele<\/strong>, mis lihtsustaks oluliselt menetlust nii toetuse saajatele kui ka maksuhalduritele.<\/p>\n<p>See meede v\u00f5iks v\u00e4hendada halduskoormust ja k\u00f5rvaldada mured v\u00f5imalike t\u00e4iendavate maksukohustuste \u00fcle toetuste saajate jaoks. Sel viisil muutuks Moves IV plaan atraktiivsemaks ja kergemini ligip\u00e4\u00e4setavaks, edendades t\u00f5husate ja j\u00e4tkusuutlike s\u00f5idukite suuremat kasutuselev\u00f5ttu.<\/p>\n<h3>Toetuste hinna piiri t\u00f5stmine elektriautode jaoks<\/h3>\n<p>\u00dcks oodatumaid muudatusi on <strong>elektriautode toetuste hinna piiri t\u00f5stmine<\/strong>. Praeguses Moves III plaani pikendamises on see piir <strong>45.000 eurot<\/strong> enne makse. Oodatakse, et Moves IV plaanis t\u00f5stetakse see piir, v\u00f5imaldades suuremal arvul s\u00f5idukimudelitel osaleda toetuste programmis.<\/p>\n<p>See t\u00f5us v\u00f5iks aidata muuta <strong>Moves IV plaani kaasavamaks ja t\u00f5husamaks<\/strong>, julgustades rohkem tarbijaid kaaluma elektriautode ostmist. See muudatus koos maksustamise lihtsustamise ja toetuste kiirendamisega v\u00f5ib oluliselt muuta j\u00e4tkusuutliku liikuvuse turgu Hispaanias.<\/p>\n<h2>Kas soovid paigaldada laadimispunkti? Avasta meie laadimispunktide paigaldajate v\u00f5rgustik<\/h2>\n<p>Kokkuv\u00f5ttes <strong>Moves III plaani pikendamine<\/strong> kuni 2024. aasta l\u00f5puni, mille eelarve \u00fcletab 1.500 miljonit eurot, <strong>esindab ainulaadset v\u00f5imalust edendada elektriautode kasutuselev\u00f5ttu<\/strong> ja parandada laadimisinfra struktuuri Hispaanias. Seet\u00f5ttu soovitame sul leida <strong><a href=\"https:\/\/v2charge.com\/et\/encuentra-tu-instalador\/\">laadimispunktide paigaldaja<\/a><\/strong>, kes aitab sul Moves III plaani toetuste taotlemisel.<\/p>\n<div class=\"wp-block-uagb-image uagb-block-d341e346 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none uag-hide-desktop\"><figure class=\"wp-block-uagb-image__figure\"><a class=\"\" href=\"https:\/\/v2charge.com\/et\/encuentra-tu-instalador\/\" target=\"\" rel=\"noopener\"><img decoding=\"async\" srcset=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche.jpg ,https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche.jpg 780w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-instalador-cargador-coche.jpg\" alt=\"Encuentra instalador cargador Plan Moves III\" class=\"uag-image-162289\" width=\"818\" height=\"818\" title=\"plan-moves-instalador-cargador-coche\" loading=\"lazy\" role=\"img\"\/><\/a><\/figure><\/div>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-3e531fbf wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none uag-hide-tab uag-hide-mob\"><figure class=\"wp-block-uagb-image__figure\"><a class=\"\" href=\"https:\/\/v2charge.com\/et\/encuentra-tu-instalador\/\" target=\"\" rel=\"noopener\"><img decoding=\"async\" srcset=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/encuentra-instalador-plan-moves.jpg ,https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/encuentra-instalador-plan-moves.jpg 780w, https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/encuentra-instalador-plan-moves.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/encuentra-instalador-plan-moves.jpg\" alt=\"Busca tu instalador cargador con el Plan Moves III\" class=\"uag-image-162299\" width=\"818\" height=\"818\" title=\"encuentra-instalador-plan-moves\" loading=\"lazy\" role=\"img\"\/><\/a><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Uuendatud 1. aprillil 2025: Moves III plaani kehtivust pikendatakse tagasiulatuvalt kuni 31. detsembrini 2025. Kehtib alates 1. jaanuarist 2025 tehtud ostudele. 25. juunil 2024 on Hispaania valitsus pikendanud Moves III plaani 2024. aastal kuni 31. detsembrini. Suurep\u00e4rane uudis elektrilise liikuvuse armastajatele ja j\u00e4tkuvaks abiks \u00fcleminekuks keskkonnas\u00f5bralikumale liikuvusele. Moves III plaani pikendamine pakub uusi v\u00f5imalusi neile, &#8230; <a title=\"Uus Moves III plaani laiendus 2024. aastal: N\u00f5uded ja sammud taotlemiseks\" class=\"read-more\" href=\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\" aria-label=\"Read more about Uus Moves III plaani laiendus 2024. aastal: N\u00f5uded ja sammud taotlemiseks\">Read more<\/a><\/p>\n","protected":false},"author":400,"featured_media":162160,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","content-type":"","_uag_custom_page_level_css":"","footnotes":""},"categories":[],"tags":[],"class_list":["post-360611","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.3.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Plan Moves III 2024 laiendamine: N\u00f5uded ja J\u00e4rgitavad Sammud<\/title>\n<meta name=\"description\" content=\"\u2714\ufe0f Plan Moves III on pikendatud kuni 31. detsembrini 2024. Uuri, kuidas sellest kasu saada. Toetused elektriautodele ja laadimispunktidele.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plan Moves III 2024 laiendamine: N\u00f5uded ja J\u00e4rgitavad Sammud\" \/>\n<meta property=\"og:description\" content=\"\u2714\ufe0f Plan Moves III on pikendatud kuni 31. detsembrini 2024. Uuri, kuidas sellest kasu saada. Toetused elektriautodele ja laadimispunktidele.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\" \/>\n<meta property=\"og:site_name\" content=\"V2C\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/V2C.Charge\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-27T08:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-04T11:36:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"V2C\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@V2C_Charge\" \/>\n<meta name=\"twitter:site\" content=\"@V2C_Charge\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"V2C\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\"},\"author\":{\"name\":\"V2C\",\"@id\":\"https:\/\/v2charge.com\/et\/#\/schema\/person\/47b01868f6351f17635b441e66044aaa\"},\"headline\":\"Uus Moves III plaani laiendus 2024. aastal: N\u00f5uded ja sammud taotlemiseks\",\"datePublished\":\"2024-06-27T08:00:00+00:00\",\"dateModified\":\"2025-04-04T11:36:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\"},\"wordCount\":1622,\"publisher\":{\"@id\":\"https:\/\/v2charge.com\/et\/#organization\"},\"image\":{\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg\",\"inLanguage\":\"et\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\",\"url\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\",\"name\":\"Plan Moves III 2024 laiendamine: N\u00f5uded ja J\u00e4rgitavad Sammud\",\"isPartOf\":{\"@id\":\"https:\/\/v2charge.com\/et\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg\",\"datePublished\":\"2024-06-27T08:00:00+00:00\",\"dateModified\":\"2025-04-04T11:36:12+00:00\",\"description\":\"\u2714\ufe0f Plan Moves III on pikendatud kuni 31. detsembrini 2024. Uuri, kuidas sellest kasu saada. Toetused elektriautodele ja laadimispunktidele.\",\"breadcrumb\":{\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage\",\"url\":\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg\",\"contentUrl\":\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg\",\"width\":960,\"height\":560,\"caption\":\"Ampliaci\u00f3n Plan Moves III 2024 Requisitos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"V2C\",\"item\":\"https:\/\/v2charge.com\/et\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sin categorizar\",\"item\":\"https:\/\/v2charge.com\/et\/sin-categorizar\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Informaci\u00f3n\",\"item\":\"https:\/\/v2charge.com\/es\/e-mobility\/informacion\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Uus Moves III plaani laiendus 2024. aastal: N\u00f5uded ja sammud taotlemiseks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/v2charge.com\/et\/#website\",\"url\":\"https:\/\/v2charge.com\/et\/\",\"name\":\"V2C\",\"description\":\"#CargandoElMa\u00f1ana\",\"publisher\":{\"@id\":\"https:\/\/v2charge.com\/et\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/v2charge.com\/et\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/v2charge.com\/et\/#organization\",\"name\":\"V2C\",\"url\":\"https:\/\/v2charge.com\/et\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\/\/v2charge.com\/et\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/11\/cropped-v2c-charge-logo-menu.png\",\"contentUrl\":\"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/11\/cropped-v2c-charge-logo-menu.png\",\"width\":984,\"height\":431,\"caption\":\"V2C\"},\"image\":{\"@id\":\"https:\/\/v2charge.com\/et\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/V2C.Charge\",\"https:\/\/x.com\/V2C_Charge\",\"https:\/\/www.instagram.com\/v2c.charge\/\",\"https:\/\/www.youtube.com\/@V2C\",\"https:\/\/www.linkedin.com\/company\/v2c-chargers\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/v2charge.com\/et\/#\/schema\/person\/47b01868f6351f17635b441e66044aaa\",\"name\":\"V2C\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\/\/v2charge.com\/et\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a91128c4c0d2f4d63bd586301fdec6cc9aa49c885839b25d1c62700f529f267c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a91128c4c0d2f4d63bd586301fdec6cc9aa49c885839b25d1c62700f529f267c?s=96&d=mm&r=g\",\"caption\":\"V2C\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Plan Moves III 2024 laiendamine: N\u00f5uded ja J\u00e4rgitavad Sammud","description":"\u2714\ufe0f Plan Moves III on pikendatud kuni 31. detsembrini 2024. Uuri, kuidas sellest kasu saada. Toetused elektriautodele ja laadimispunktidele.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/","og_locale":"et_EE","og_type":"article","og_title":"Plan Moves III 2024 laiendamine: N\u00f5uded ja J\u00e4rgitavad Sammud","og_description":"\u2714\ufe0f Plan Moves III on pikendatud kuni 31. detsembrini 2024. Uuri, kuidas sellest kasu saada. Toetused elektriautodele ja laadimispunktidele.","og_url":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/","og_site_name":"V2C","article_publisher":"https:\/\/www.facebook.com\/V2C.Charge","article_published_time":"2024-06-27T08:00:00+00:00","article_modified_time":"2025-04-04T11:36:12+00:00","og_image":[{"width":960,"height":560,"url":"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg","type":"image\/jpeg"}],"author":"V2C","twitter_card":"summary_large_image","twitter_creator":"@V2C_Charge","twitter_site":"@V2C_Charge","twitter_misc":{"Written by":"V2C","Est. reading time":"12 minutit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#article","isPartOf":{"@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/"},"author":{"name":"V2C","@id":"https:\/\/v2charge.com\/et\/#\/schema\/person\/47b01868f6351f17635b441e66044aaa"},"headline":"Uus Moves III plaani laiendus 2024. aastal: N\u00f5uded ja sammud taotlemiseks","datePublished":"2024-06-27T08:00:00+00:00","dateModified":"2025-04-04T11:36:12+00:00","mainEntityOfPage":{"@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/"},"wordCount":1622,"publisher":{"@id":"https:\/\/v2charge.com\/et\/#organization"},"image":{"@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage"},"thumbnailUrl":"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg","inLanguage":"et"},{"@type":"WebPage","@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/","url":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/","name":"Plan Moves III 2024 laiendamine: N\u00f5uded ja J\u00e4rgitavad Sammud","isPartOf":{"@id":"https:\/\/v2charge.com\/et\/#website"},"primaryImageOfPage":{"@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage"},"image":{"@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage"},"thumbnailUrl":"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg","datePublished":"2024-06-27T08:00:00+00:00","dateModified":"2025-04-04T11:36:12+00:00","description":"\u2714\ufe0f Plan Moves III on pikendatud kuni 31. detsembrini 2024. Uuri, kuidas sellest kasu saada. Toetused elektriautodele ja laadimispunktidele.","breadcrumb":{"@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#primaryimage","url":"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg","contentUrl":"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg","width":960,"height":560,"caption":"Ampliaci\u00f3n Plan Moves III 2024 Requisitos"},{"@type":"BreadcrumbList","@id":"https:\/\/v2charge.com\/et\/uus-moves-iii-plaani-laiendus-2024-aastal-n-uded-ja-sammud-taotlemiseks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"V2C","item":"https:\/\/v2charge.com\/et\/"},{"@type":"ListItem","position":2,"name":"Sin categorizar","item":"https:\/\/v2charge.com\/et\/sin-categorizar\/"},{"@type":"ListItem","position":3,"name":"Informaci\u00f3n","item":"https:\/\/v2charge.com\/es\/e-mobility\/informacion\/"},{"@type":"ListItem","position":4,"name":"Uus Moves III plaani laiendus 2024. aastal: N\u00f5uded ja sammud taotlemiseks"}]},{"@type":"WebSite","@id":"https:\/\/v2charge.com\/et\/#website","url":"https:\/\/v2charge.com\/et\/","name":"V2C","description":"#CargandoElMa\u00f1ana","publisher":{"@id":"https:\/\/v2charge.com\/et\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/v2charge.com\/et\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Organization","@id":"https:\/\/v2charge.com\/et\/#organization","name":"V2C","url":"https:\/\/v2charge.com\/et\/","logo":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/v2charge.com\/et\/#\/schema\/logo\/image\/","url":"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/11\/cropped-v2c-charge-logo-menu.png","contentUrl":"https:\/\/v2charge.com\/wp-content\/uploads\/2024\/11\/cropped-v2c-charge-logo-menu.png","width":984,"height":431,"caption":"V2C"},"image":{"@id":"https:\/\/v2charge.com\/et\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/V2C.Charge","https:\/\/x.com\/V2C_Charge","https:\/\/www.instagram.com\/v2c.charge\/","https:\/\/www.youtube.com\/@V2C","https:\/\/www.linkedin.com\/company\/v2c-chargers\/"]},{"@type":"Person","@id":"https:\/\/v2charge.com\/et\/#\/schema\/person\/47b01868f6351f17635b441e66044aaa","name":"V2C","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/v2charge.com\/et\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a91128c4c0d2f4d63bd586301fdec6cc9aa49c885839b25d1c62700f529f267c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a91128c4c0d2f4d63bd586301fdec6cc9aa49c885839b25d1c62700f529f267c?s=96&d=mm&r=g","caption":"V2C"}}]}},"uagb_featured_image_src":{"full":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"thumbnail":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos-150x150.jpg",150,150,true],"medium":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos-300x175.jpg",300,175,true],"medium_large":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos-768x448.jpg",768,448,true],"large":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"gs-tiny":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",50,29,false],"xl":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"xxl":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"xxxl":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"xxxxl":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"xxxxxl":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"1536x1536":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false],"2048x2048":["https:\/\/v2charge.com\/wp-content\/uploads\/2024\/06\/plan-moves-iii-2024-ampliacion-requisitos.jpg",960,560,false]},"uagb_author_info":{"display_name":"V2C","author_link":"https:\/\/v2charge.com\/et\/author\/marketing\/"},"uagb_comment_info":0,"uagb_excerpt":"Uuendatud 1. aprillil 2025: Moves III plaani kehtivust pikendatakse tagasiulatuvalt kuni 31. detsembrini 2025. Kehtib alates 1. jaanuarist 2025 tehtud ostudele. 25. juunil 2024 on Hispaania valitsus pikendanud Moves III plaani 2024. aastal kuni 31. detsembrini. Suurep\u00e4rane uudis elektrilise liikuvuse armastajatele ja j\u00e4tkuvaks abiks \u00fcleminekuks keskkonnas\u00f5bralikumale liikuvusele. Moves III plaani pikendamine pakub uusi v\u00f5imalusi neile,&hellip;","_links":{"self":[{"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/posts\/360611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/users\/400"}],"replies":[{"embeddable":true,"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/comments?post=360611"}],"version-history":[{"count":0,"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/posts\/360611\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/media\/162160"}],"wp:attachment":[{"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/media?parent=360611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/categories?post=360611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/v2charge.com\/et\/wp-json\/wp\/v2\/tags?post=360611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}